How to Get Subcontract Work from General Contractors (And Why You Might Outgrow It)

Mo El Hadri
Stories by Mo El Hadri
@mointhemarket·9 November 2026·7 min read

To get subcontract work, you need to be on the right general contractor's approved supplier list and know how to win a package bid when it lands. That is the whole answer. (Figures in this post are in USD - the model is identical in any currency.)

Most trade businesses sit and wait. They rely on word of mouth from past clients, repeat calls from one or two GCs they know, and hope. That is not a business - that is luck with a van.

What I am going to describe here is how the subcontract market actually works. And partway through, you are going to start seeing why the smartest operators eventually stop chasing sub packages and start handing them out instead - because that is the real business model, and it has a name: construction arbitrage.

Where subcontract packages actually come from

Subcontract work flows from general contractors (main contractors in the UK), managing agents, housing associations, and larger facilities management companies. All of them work the same way: they win a contract from an end client, then break the physical work into trade packages and hire specialists to deliver each one.

Those packages go to one of two places: either the approved supplier list (a pre-vetted set of subs the GC already trusts) or an open tender (where anyone can bid). Being on the approved list is worth ten times more than being in the open tender pile.

  • General contractors on private residential and commercial projects
  • Housing associations and local authorities (high volume, steady pipeline)
  • Managing agents and property management companies (ongoing maintenance work)
  • Facilities management companies with multi-site contracts
  • Main contractors on public sector frameworks

The GCs with the most consistent sub pipelines are the ones with long-term client relationships - housing associations, local authority frameworks, commercial property portfolios. Getting into one of those pipelines is different from chasing one-off residential jobs.

How to get on a general contractor's approved supplier list

Every serious GC has an approved supplier list. Some call it a preferred vendor list, some call it a pre-qualified contractor database. The name does not matter. What matters is getting on it before they go out to tender, not after.

The entry process is usually a prequalification questionnaire - the GC sends you a form, you fill it in, they check it. Here is what every PQQ asks for:

  • Company registration documents and accounts
  • Proof of insurance (general liability and workers' compensation at minimum - check the GC's required limits)
  • Health and safety policy and accreditations (CHAS, SafeContractor, ISO are common in the UK; OSHA compliance and state licences in the US)
  • References from past GCs or similar clients
  • List of relevant completed projects with values
  • Key contact and emergency out-of-hours number

In the US, platforms like BuildingConnected (owned by Autodesk) and Dodge Construction Network let GCs invite subs to bid electronically and manage their approved lists. Getting a profile on both is worth doing if you are targeting commercial GC work. In the UK, Find a Tender covers public sector contracts above the threshold, and most larger main contractors have their own supplier portals.

The fastest shortcut: call the GCs whose site boards you see in your area. Ask for the contracts manager or the person who handles subcontractor appointments. Tell them what trade you do, what size of package you can handle, and ask what they need from you to get onto their list. Most will give you a form within five minutes.

How to win a subcontract bid when it lands

Being on the approved list gets you invited. Winning the bid is a different skill. Here is what GCs actually want when they open the sub bids:

  • A price that is complete - no gaps, no asterisks, no 'TBC for materials'. Gaps cost the GC time and money, and they will give the work to the sub who makes it easy.
  • A quick response. GCs are working to programme. If your quote takes a week when others come back in two days, you are out.
  • Clear start date availability. Tell them you can mobilise on the agreed programme date. If you can't, say so now.
  • One clear point of contact. No confusion about who is running the job and who to call when something changes.
  • No surprises on insurance and paperwork. Have it ready before they ask.

On price: do not go in low to win and hope to make it back on variations. That is the fastest way to damage a relationship with a GC who could have been feeding you work for years. Price your true cost - labour, materials, management time, your margin - and hold it.

Building relationships with GCs - the work that actually fills your calendar

Cold bidding on tenders is hard work for thin returns. Relationship-based work is completely different.

The GC you have already worked with calls you first. The GC who does not know you puts your quote in a pile with twelve others. The difference in workload between those two positions is not close.

After every job, check in with the contracts manager. Not to ask for more work - just to flag that the job went well and you are available for the next one. Send a WhatsApp. Keep it short. That is literally what most subs do not do, and it is why a handful of trade businesses get the same GC's work every time while everyone else bids cold.

Also: be easy to manage on site. Show up when you said you would. Flag problems early. Do not let the GC hear about an issue from the client before you have already reported it. GCs protect the subs who protect them.

The numbers - what a sub earns versus what the GC earns on the same project

Here is the part that changes how most good subs see their business. These are illustrative numbers to show the structure - actual margins vary by trade, region, and job type.

As the subcontractorAs the general contractor
Role on the projectElectrical packageWhole project
Contract value$22,000 (your package)$100,000 (full contract)
Your costs$14,000 (labour + materials)$75,000 (all sub packages + materials)
Gross margin$8,000$25,000
What you manageYour own crew and materialsClient, all trades, programme
Projects needed for $100k/year gross margin12-134

The GC's margin % is lower. But it is on the full project value, not just one package. And crucially - the GC is not on the tools. They are coordinating. That is the whole difference between trading time for money and running a business.

To be clear: most subs who look at this table still want to stay subs, and that is fine. If you are a specialist trade and you are good at it, you can build a solid business doing sub work. But if you have ever looked at the GC on a project and thought "I could do that", the numbers are telling you something.

When to stop chasing sub work and become the GC instead

The model where you win the full contract from the client and hire your own network of subs to deliver the physical work is called construction arbitrage. It is how every general contracting business actually operates. You hold the client relationship. Your subs do the work. You earn on the spread.

If you are winning sub packages consistently, you already have three of the four things you need to flip the model: trade knowledge, supplier relationships, and site credibility. The one thing you need to build is the client relationship - getting in front of the person who signs the full contract, not just the GC who sub-lets it to you.

That is what the Playbook covers in depth. Getting sub work is a good start. Building the whole operation is the actual play.

If you want to go from winning sub packages to running the whole contract - and keeping the full margin - this is where to start.

Get access to Contractor Club⟶
ShareXWhatsAppLinkedIn

Frequently asked questions

Do I need to be a limited company to get subcontract work from a GC?+

Not always, but larger GCs and commercial projects often require it. Many housing associations and managing agents only sub out to incorporated businesses because they need company accounts and employer liability insurance. If you are still a sole trader, registering as a limited company (or LLC in the US) will open up more doors than any other single move.

How do I find general contractors looking for subcontractors?+

In the US, BuildingConnected and Dodge Construction Network are the two main platforms GCs use to invite subs to bid. In the UK, check Find a Tender for public sector work and reach out to main contractors directly for private work. The fastest route in any market is to call local GCs whose boards you see on active sites and ask who handles their sub packages.

What insurance do I need to get subcontract work?+

At minimum: general liability (the amount varies by trade and project, but $1M-$2M per occurrence is standard for most US commercial work) and workers' compensation if you have employees. Most GCs will also want to see you listed as naming them as an additional insured on your policy. Requirements vary by state, province, and country, so read the GC's prequalification documents carefully and match what they ask for exactly.

How do I price a subcontract package to win work without going in too low?+

Price your actual cost first - labour, materials, equipment, your own time for management and admin. Then apply a margin that makes the job worth taking. The mistake most subs make is pricing to win and then resenting the job. A GC who calls you back wants you because you do good work and show up - they are not looking for the cheapest quote, they are looking for the most reliable one at a reasonable price.

What is the difference between being a subcontractor and running a general contracting business?+

As a sub you do your trade and earn your margin on your own package. As a GC you win the whole contract from the client, then hire subs to do the trades - including the trade you used to do yourself. The GC earns a margin on every package, not just one. The same project that earns you $8,000 as a sub might earn the GC $25,000 as the main contractor. The GC model is what construction arbitrage is built on.

Can I do subcontract work and run my own GC projects at the same time?+

Yes, and plenty of operators do exactly that at the start. You take sub packages to keep the cash coming in while you build your own client pipeline on the side. The goal is to gradually shift the mix until you are running your own projects full time. The sub work gives you cash flow and site relationships; your own projects give you the margin and the business you actually want to build.

The human behind The Playbook

Go deeper

Learn the model, then get in the room

The full breakdown of construction arbitrage lives on our sister site, constructionarbitrage.com. When you want the operators who actually run it, join the Construction Arbitrage Players community.

My listening book THE EDGE is out now - 24 chapters on how the money really moves through a contracting business, made to be listened to on the drive. Free to start. See what is inside.

My book The Family Secret - how construction arbitrage really works - is coming soon.