How to manage subcontractors is really a question about how to run your business. The whole point of the general contractor (main contractor in the UK) model is that you hold the contract, the subbies do the work, and you keep the margin in the middle. That only works if you can manage the people doing the work without being on site all day.

Why most contractors manage subs badly

The usual approach is: get a price from a sub, give them a start date, hope it goes well. No written scope, no programme, no agreed milestone for payment, no inspection process. Then when something goes wrong - the sub goes quiet, the work is below standard, the job overruns - there is nothing to fall back on.

I ran a property maintenance business in London using a network of subcontractors for housing associations and letting agents. The jobs that went badly were almost always the ones where I had skipped the upfront setup. The jobs that ran well had one thing in common: the sub knew exactly what they were building, by when, and what I would inspect before I paid.

That is the whole system. Everything else is just detail.

Brief subcontractors properly before day one

Before a sub sets foot on site, they need to know:

  • The full scope of their works - in writing, referencing the drawings or the client brief.
  • The access arrangements: who holds keys, what hours they can work, where materials are stored.
  • Who else is on site and in what sequence - so they know who they are waiting on and who is waiting on them.
  • The programme: when they are expected to start and when they are expected to finish.
  • What 'done' looks like for their trade - the standard they are being inspected against.
  • The payment milestone: what they need to complete before payment is released.

Send this in an email before they start. It takes 10 minutes. It prevents a week of avoidable calls, delays, and disputed variations.

Tie payment to milestones, not to dates

If you pay a sub on the 25th of every month regardless of progress, you have handed them a standing order and kept no leverage for yourself. Payment tied to a milestone gives you something to hold. The sub knows: when this stage is complete and passes inspection, the money moves. Until then, it does not.

Here is a simple milestone structure for a typical trade scope (figures in USD - the model and the math are identical in any currency):

Payment stageTriggerTypical amount
MobilisationSub confirmed and materials ordered10-20% of sub contract value
First fixFirst fix complete, inspected and signed off35-40%
Second fixSecond fix complete, inspected and signed off35-40%
FinalSnagging cleared and practical completion agreed10-15%

The snagging stage is the one most general contractors rush. Do not. Release the final payment only when the snag list is cleared. For larger contracts, see construction punch lists for how to run this properly.

How to inspect subcontractor work without being on site all day

You do not need to be on site every day. You need to be there at the right moments.

Check at each milestone before you release payment. For smaller scopes, a WhatsApp video or a set of photos with timestamps is enough. For anything structural or anything that affects what goes on top - foundations, first fix plumbing, first fix electrical - go in person. These are the stages where mistakes get buried.

The subs worth having want to be inspected. They take pride in their work. The ones who resist inspection are telling you something.

@mointhemarket

Have a standard checklist for each trade. First fix plumbing has specific things to look at. First fix electrical has others. Run through the same list every time so you are not making it up as you go. This protects you from missing something obvious and gives the sub a clear standard to work to.

Handling defects and subcontractor disputes

When work is not up to standard, the most important thing is speed. Document it the same day.

Take photos. Send an email to the sub that same day with a description of the defect and what needs to be done. 'The tiling in the main bathroom has a 3mm lippage on the east wall - this needs to be relaid before final payment is released.' Specific, written, dated. That email is your evidence if it escalates.

Do not hold back payment without telling the sub exactly why and what they need to do to unlock it. 'I am withholding the final stage payment pending rectification of the defects listed in my email of [date].' Give them a clear path to payment. Most disputes that end up in adjudication or court started with a paymaster who went silent without explanation.

If a sub will not fix defects and will not engage, bring in a replacement sub to rectify the work and charge the original sub the cost. Keep every invoice and every piece of correspondence. For the full toolkit on client-side non-payment, the same principles apply - see what to do when a client does not pay.

What to do when a subcontractor goes quiet mid-job

It happens. A sub takes on too much work elsewhere, has a personal situation, or simply stops showing up.

  • Call once and text once. Give 24 hours for a response.
  • If no response, go to site and photograph the current state of the works.
  • Write formally to say you consider the sub to have abandoned the works. Send it by email and recorded post.
  • Get quotes from replacement subs immediately.
  • Issue a letter saying you intend to bring in replacement labour at the original sub's cost - give them a final 48 hours to respond.
  • If they do not respond, engage the replacement sub, document all costs, and pursue the original sub for the difference.

The worst thing you can do is wait. Every day a sub is absent without communication is a day of delay on a live job with a client who is expecting progress. Act on day two, not day ten.

Tax and compliance when paying subcontractors

Depending on your country, you may have reporting or deduction obligations when you pay subcontractors. These are not optional and ignorance is not a defence. The main ones:

CountryObligationKey detail
UKConstruction Industry Scheme (CIS)Register as a contractor, verify each sub with HMRC, deduct 20% from registered subs, 30% from unregistered. 0% for subs with gross payment status. Deductions paid to HMRC monthly.
USAForm 1099-NECFile a 1099-NEC for each non-employee (non-corporation) sub paid $2,000 or more for services in a tax year (threshold increased from $600 for years after 2025). Due 31 January. Check IRS.gov for current rules.
CanadaT4A reportingReport payments to self-employed subcontractors on a T4A slip if you paid $500 or more in a calendar year. Check CRA.gc.ca for current thresholds and filing rules.
AustraliaTaxable Payments Annual Report (TPAR)Building and construction businesses that pay subcontractors for building services must lodge an annual TPAR with the ATO. Check ato.gov.au for current rules and lodgement deadlines.
New ZealandSchedular paymentsPayments to contractors for certain services may be subject to schedular payment withholding. Check ird.govt.nz for current rules and whether your payments qualify.

UK contractors: register for CIS before you pay your first sub. The penalties for failure to deduct and pay over CIS deductions are serious. The verified facts above for UK CIS rates come from gov.uk - always confirm current rates and thresholds directly with HMRC before making deductions.

US contractors: the $2,000 threshold applies to tax years beginning after 2025. For prior years, the threshold was $600. Source: IRS Instructions for Form 1099-NEC, revised December 2026. Use IRS.gov to confirm.

For all countries: consult a local accountant before you start paying subcontractors. Getting this right from the start is far cheaper than fixing it later.

Building a subcontractor network worth having

The subs who do consistent, quality work for you are worth more than you think. Treat them accordingly.

Pay on time - ideally faster than they expect. Send work their way when you have it. Give them enough notice to plan their diary. Tell them what went well on a job, not just what went wrong. These things sound simple. Most GCs do not do them. The result is that the best subbies leave for whoever does.

This is what running construction arbitrage at scale actually looks like. You are not selling your labour. You are managing a supply chain. The business is only as good as the people in it. If your subs are flaky, your business is flaky - and so is your margin. The whole system for finding them is in how to find good subcontractors.

This model - hold the contract, subs do the work, you keep the spread - is what every general contractor in the market already runs. What most of them do not have is a system for managing it. That system is what separates the ones who grow from the ones who grind.

Build the system behind the margin.

Request Access⟶
ShareXWhatsAppLinkedIn

Frequently asked questions

What is the right way to pay subcontractors?+

Pay against milestones, not against time. Define what 'done' looks like before the job starts, then release payment when that milestone is hit and the work is inspected. For longer projects, structure it as a deposit when they mobilise, progress payments at defined stages, and final payment when snagging is cleared. Never pay the full amount up front.

How do I keep subcontractors accountable without being on site all day?+

Brief them properly at the start - scope, programme, who else is on site, what done looks like. Then check at the milestone, not in the middle. A WhatsApp photo of the stage completed is enough for smaller scopes. If a sub knows you will inspect before you pay, they stay on top of the standard.

What do I do if a subcontractor does bad work?+

Document it in writing the same day you spot it. Photo, email, specific description of the defect. Do not pay the stage until it is made good. If the sub will not fix it, hold the payment and bring in another sub to rectify. Keep a record of everything in case it escalates.

What happens when a subcontractor goes quiet mid-job?+

Call once, text once. If no response within 24 hours, go to site and assess what has been done. Write formally to say you consider the sub to have abandoned the works and that you are bringing in replacement labour at their cost. Keep copies. This is what the contract is for.

Do I need to deduct tax from subcontractor payments?+

In the UK, yes - if you are registered under the Construction Industry Scheme (CIS), you must deduct 20% from registered subcontractors and 30% from unregistered ones, then pay those deductions to HMRC. In the US, if you pay a subcontractor more than $2,000 for services in a tax year (for years after 2025), you must file a 1099-NEC with the IRS. Requirements vary by country - check with a local accountant.

How many subcontractors should I use for one project?+

As many trades as the project needs, but keep the management layer tight. Each trade has one lead sub responsible for that scope. You manage the leads, the leads manage their own crew. Trying to manage individual tradespeople directly is how you end up doing site management full time instead of running a business.

The human behind The Playbook

Go deeper

Learn the model, then get in the room

The full breakdown of construction arbitrage lives on our sister site, constructionarbitrage.com. When you want the operators who actually run it, join the Construction Arbitrage Players community.

My listening book THE EDGE is out now - 24 chapters on how the money really moves through a contracting business, made to be listened to on the drive. Free to start. See what is inside.

My book The Family Secret - how construction arbitrage really works - is coming soon.

Only Players Know

The game is real. The room is closed.

Contractor Club is a private, application-only circle of construction arbitrage operators. If you think you belong inside, apply and the circle will decide.

More from the Playbook

View all ⟶