
How to Start a Construction Business (The Model That Actually Makes Money)
Starting a construction business does not mean buying tools and turning up on someone's site. The money is in the contract - the gap between what the client pays you and what it costs to deliver the work. That gap is the business. (Figures in this post are in USD - the model and the math are identical in any currency.)
A general contractor (main contractor in the UK) holds the prime contract, hires licensed subcontractors to do the physical work, and keeps the margin between the two prices. That is it. You are not a builder. You are a business operator who manages the relationship between the client and the work.
The model you are actually building
What I ran in London was a property maintenance company - housing associations, letting agents, one contract, subbies doing the work, me keeping the spread. I was not the tradesman. I was the operator. That structure is what people are now calling construction arbitrage: you hold the prime contract, specialists execute the work, you earn the margin in between. People have been doing this for 40 years. It is not new. What is new is understanding it as a repeatable business model from day one.
The thing most new contractors miss: they start by buying a van, doing the work, and wondering why they are broke. If the site collapses the day you leave, you don't own a business - you own a job. The general contractor model builds the gap between you and the work from the start. That is what this guide is about.
Do you need a licence before you start?
That depends where you are - and you need to know before you quote your first job. In roughly 28 US states, a contractor licence is required at state level before you can legally hold a prime contract. In Australia, a state-based builder licence is required. In Canada, Quebec has the strictest requirements via the RBQ. The UK and New Zealand have no national contractor licence, though individual trades (gas, electrical) need their own certifications.
The full licensing breakdown by country is in the general contractor guide. Read that before you start quoting anything. Working without a required licence can mean void contracts, fines, and personal liability that your insurance will not cover.
Step one - register your business entity
Before you sign a contract with anyone, you need a registered legal entity. It protects you personally if something goes wrong on a project, and it is what clients, banks, and insurers need to see. Here is the headline position in each major English-speaking market - always verify fees with the official registration body before filing, as they change:
| Country | Entity type | Typical registration fee | Official registration body |
|---|---|---|---|
| USA | LLC (Limited Liability Company) | $50 to $500 state filing fee - most states $50 to $200, national average around $130. Additional ongoing fees (annual reports, registered agent, sometimes a franchise tax) vary by state. | Your state's Secretary of State website. Fees and requirements differ per state - California's annual franchise tax alone is $800. |
| UK | Limited company (Ltd) | £100 online as of February 2026. Same-day registration (via filing software) is £156. Paper registration is £124. | Companies House (gov.uk/register-your-company). The £13 figure sometimes quoted online is the DS01 strike-off fee - not incorporation. |
| Canada | Federal corporation (CBCA) or provincial corporation | Federal online incorporation: $200. Provincial varies - Ontario is around $300. Quebec has the most requirements via the RBQ for contractors specifically. | Corporations Canada (canada.ca/corporations-canada) for federal. Your provincial registry for a provincial corporation. |
| Australia | Pty Ltd (proprietary limited company) | Around $636 ASIC registration fee from July 2026 (up from $611). Annual ASIC review fee around $342 per year from July 2026. | ASIC (asic.gov.au). Fees change annually - verify the current schedule before filing. |
| New Zealand | Limited company | Around NZD $137 online (GST-inclusive) as of 2026. Annual return fee is separate - check the current schedule. | Companies Office (companiesoffice.govt.nz). |
Step two - get your insurance in place
General liability insurance is the non-negotiable baseline. Without it, you cannot sign contracts with commercial clients - most require at least $1 million per occurrence and $2 million aggregate as a minimum before they will deal with you. It also covers damage to third-party property and bodily injury claims during your work.
Premiums for construction general liability typically run from $500 to several thousand dollars per year depending on your trade, revenue, and location. Roofing, demolition, and structural work cost more to insure than general maintenance or renovation. Get quotes from at least three brokers who specialise in construction - published averages are useless for your specific situation.
- General liability - minimum $1M per occurrence / $2M aggregate for commercial work. Non-negotiable.
- Workers compensation - required when you hire direct employees in most US states and Australian states. Check your specific state's requirements.
- Professional indemnity - add this if you are doing design-and-build or providing any technical advice as part of the contract.
- Commercial vehicle - if you are running a work vehicle, personal car insurance will not cover commercial use.
Step three - build your subcontractor network
Your subbies are the product you are selling. Not your brand. Not your website. The tradespeople you can reliably call and trust to show up and do quality work - that is your actual business asset. Build this before you quote your first job.
Here is what you need before you take your first contract. For more on finding the right people, see how to find good subcontractors:
- Two or three reliable contacts per trade - at least electrical, plumbing, general labour/finishing
- Confirmed they hold the right licences and their own liability insurance
- Pricing conversations before you quote - you need to know their day rates and material markups
- A clear process for how you brief them and how they invoice you
- References from jobs they have done for other contractors, not just clients
The sub who charges 20% less is rarely 20% cheaper. They're usually 40% more expensive once you factor in the call at 9pm, the rework, and the client you lose.
Step four - win your first client
Your first client is almost always in your existing network. This is not the time for Google Ads. It is the time to talk to everyone you know - property owners, letting agents, estate agents, anyone in your personal circle who owns or manages property. Tell them what you do and what you are looking for. One introduction is all it takes to start.
When you get the enquiry, price it properly. Collect sub quotes first, add your margin, present a clear written quote. Do not undercut yourself to win the first one - a job with a bad margin teaches you exactly the wrong habit. For a full breakdown of how to price without leaving money on the table, see how to price construction jobs.
When the job is done, ask for a Google review. That review - even just one - is worth more than any ad spend at this stage. It is the difference between a prospect calling you and a prospect going elsewhere.
What the money looks like
Here is a basic example of how the margin works on a general contracting job (figures are illustrative USD - the structure is identical in any currency):
| Item | Amount |
|---|---|
| Client contract price | $120,000 |
| Subcontractor labour and materials | $80,000 |
| Overheads (insurance, admin, site visits, communication) | $10,000 |
| Your gross profit | $30,000 |
| Margin percentage | 25% |
Run two or three projects like that concurrently and you have a business, not a job. The operators who do this well are not trying to be the cheapest. They are building delivery reliability - the same subbies, the same process, the same result - so they can charge a premium and protect the margin. That is what construction arbitrage looks like when it is working at scale.
Mistakes that kill new construction businesses
- Quoting without sub prices. If you have not spoken to your subbies before you quote, your margin is a guess. Guesses go wrong on the client's dime.
- Starting without the right licence. In states and countries that require a contractor licence, one project without it can mean fines, a void contract, and personal liability that insurance will not cover. Sort the licence first.
- Underpricing to win the first job. You do not buy loyalty with a cheap first job. You buy a client who will always expect cheap. Underpricing is the fastest route to a dead business.
- Taking on jobs larger than your cash flow. You often pay subbies before the client pays the next draw. If the cash is not there, a profitable job can still kill the business. Start with projects your cash can carry.
- Staying on the tools. If you are doing the physical work yourself, you are not building a construction business - you are a tradesman with an ABN or LLC. The business starts when you step back from the site work and focus on winning contracts and managing delivery.
Starting right means starting with the right model. Contractor Club is where operators who run the margin - not the tools - share what is working right now.
Request entry to Contractor Club⟶Frequently asked questions
How much does it cost to start a construction business?+
Minimum startup costs depend on your market and model. Business registration is typically $50 to $500 in the USA, £100 in the UK (as of February 2026), around $636 in Australia, $200 in Canada, and around NZD $137 in New Zealand - always check the official registration body for current fees. Add general liability insurance ($500 to $2,000+ per year to start) and basic admin tools. If you start as a general contractor who subcontracts the physical work, you do not need to buy equipment. The real cost is your time building the sub network and winning the first client.
Do you need a licence to start a construction business?+
It depends where you are. In the USA, around 28 states require a statewide contractor licence - others regulate at city or county level. Australia requires a state-based builder licence before you take prime contracts. The UK has no national main contractor licence - individual trades carry their own certificates (Gas Safe, NICEIC). Canada varies: Quebec requires an RBQ licence, most other provinces do not. Check your specific state or country's official licensing board before you take any prime contract.
Can you start a construction business with no money?+
Not with zero money, no - you need registration fees, insurance, and working capital to cover costs before the client pays you. But you do not need equipment if you are running the general contractor model, where licensed subcontractors do the physical work. The startup capital for that model is genuinely low. What you need most is not money - it is a few reliable subbies and the ability to win the first client.
What is the best construction business model for someone just starting?+
The general contractor model - hold the prime contract, subcontract the physical work, keep the margin. You are not on the tools; you are managing the project and the client relationship. It scales without requiring you to hire a direct workforce, and the margin on the spread is where the real money sits. This is how every large construction company already operates.
What insurance do you need to start a construction business?+
General liability is the non-negotiable baseline. Most commercial clients require at least $1 million per occurrence and $2 million aggregate before they will sign a contract with you. Add professional indemnity if you are doing design-and-build work. Workers compensation kicks in once you hire directly. Talk to an insurance broker who specialises in construction - the premiums vary too much by trade and location for any published average to be reliable for your situation.
How long does it take to start a construction business?+
Registering the company takes a day online in most countries. Getting insured takes a week or two. Getting a contractor licence takes 4 to 12 weeks in most US states that require one, longer if you need to build an experience record first. The part that takes real time is building a reliable subcontractor network and winning the first client - expect a few months from a standing start before you are quoting live projects.
The human behind The Playbook
mointhemarket Managing construction businesses across continents - with full location freedom. Running several at once. Bought and sold many more.
Go deeper
Learn the model, then get in the room
The full breakdown of construction arbitrage lives on our sister site, constructionarbitrage.com. When you want the operators who actually run it, join the Construction Arbitrage Players community.
My listening book THE EDGE is out now - 24 chapters on how the money really moves through a contracting business, made to be listened to on the drive. Free to start. See what is inside.
My book The Family Secret - how construction arbitrage really works - is coming soon.
Only Players Know
The game is real. The room is closed.
Contractor Club is a private, application-only circle of construction arbitrage operators. If you think you belong inside, apply and the circle will decide.
More from the Playbook
View all ⟶
Getting StartedHow to Become a General Contractor (Even if You've Never Swung a Hammer)
You don't need to be a tradesman to run the whole site. Here is what a general contractor actually does, what licence you need in your country, and the exact steps to start.
Getting StartedHow to Start Construction Arbitrage With No Experience: Your First 30 Days
Nobody gives you the playbook. Here it is anyway - the first 30 days of starting a construction arbitrage business with no trade background, no van, and no team.