To follow up on a construction quote, call within 24 to 48 hours of sending it, ask if they have questions about the scope, and use a short three-touch sequence over two weeks before you let it go. That is the whole answer.
Most contractors never do this. They send the quote and wait. The client goes quiet, they assume they lost on price, and they move on. Some of that is right. A lot of it is wrong. The job went to the contractor who called back.
Here is the part most guides skip: this is not about being pushy. It is about being professional. A client who asked for a quote has already signalled they are interested. Following up is a service. The ones who never hear back from you assume you are either too busy or not that bothered. Neither reads well.
This is really a conversation about construction arbitrage - the model where you hold the contract, direct the subbies, and keep the margin between what the client pays and what the work costs. Operators who run that model at any real volume have this down. They quote more jobs and they close a higher percentage of them. The follow-up system is part of why.
Why contractors lose jobs by not following up
The contractor who sent in the cheapest quote did not always win. The one who called back the next day often did.
Clients who are comparing three or four quotes are not always comparing prices. They are comparing confidence. Which contractor sounds like they will actually show up, do the job on time, and not disappear when something goes wrong. Following up signals that you are that contractor.
The contractors who do not follow up tend to explain their lost jobs as a price problem. Sometimes that is true. But a client who goes dark after receiving a quote is often just waiting for someone to give them a reason to say yes. When nobody calls, they either pick the cheapest option by default or they put the whole project off.
The first follow-up: call, not email
Within 24 to 48 hours of sending the quote, call the client. Not to ask if they have made a decision. To ask if they have questions about the scope.
That distinction matters. 'Have you made a decision?' puts the pressure on them. 'Did you have any questions about the scope?' keeps the door open and frames you as someone who is there to help, not to close.
If they do not answer, leave a 20-second voicemail and follow up with a short text: 'I tried to call - happy to run through the scope when you have five minutes.' That is it. No apology. No 'just wondering if you had a chance to look at it'. Keep it clean.
The first follow-up call also gives you real information. If they say they are comparing quotes, that is useful. If they say the job has changed in scope, that is very useful. You can only get that on a call. An email sits in an inbox and tells you nothing.
What to say when you do get them on the phone
Keep it short. 'Hi - I sent the quote yesterday for the [brief job description]. Just wanted to make sure everything was clear and ask if you had any questions about what is included.'
Let them talk. Most clients have one or two things they are unsure about. It might be the payment schedule. It might be the exclusions at the bottom of the quote. It might be the timeline. Answer those questions clearly and you have already moved ahead of the contractors who sent a PDF and went quiet.
If they bring up price, do not immediately offer a discount. Ask what they want to change in the scope. 'If the number is tighter than you expected, I am happy to look at which parts of the job we can phase or simplify - what is the main priority for you?' That changes the whole conversation from 'can you go lower' to 'what do you need'.
The day 5 to 7 check-in
If you have not heard back after the first call and your follow-up text, send one more message around day 5 to 7. Keep it short.
- What you are doing: checking in, not chasing.
- What to say: 'Hi [name] - just following up on the quote for [job description]. Happy to adjust the scope or timeline if anything has changed on your end.'
- What you are not doing: apologising for following up, restating the quote, or asking again if they have decided.
The offer to adjust scope or timeline does something specific. It opens the door for a client who is on the fence because something has changed - their budget moved, the job got delayed, they want to break it into phases. That is a conversation you want to have. Without the offer, you never find out.
The day 10 to 14 close
One final message, two to three weeks after sending the quote. This one is a soft close.
Something like: 'Hi [name] - just a last note on the [job description] quote. If you want to go ahead, I can lock in a start date and get the paperwork moving. If the timing is not right, no problem at all - worth knowing so I can plan my schedule.'
That message does two things. It makes it easy for the interested client to say yes. And it gives the undecided client an easy, face-saving way to end the conversation either way. Most clients who have been going quiet do not reply because they feel awkward about not having made a decision. This removes that awkwardness.
After two weeks of silence, let it go
If you have followed the sequence above and there is still no response, stop. Do not send a fourth message. Do not lower your price in a cold email hoping something will land.
Keep the lead in your records. Some clients come back months later. They went with someone cheaper, it went badly, and now they are looking for someone they can actually trust. The contractor who sent a professional quote and followed up without chasing is the one they call. I have had this happen on jobs where I had written off the lead entirely.
What you do not want is a reputation for being the contractor who sends long desperate messages two months after a quote went cold. That reads badly. A short, clean sequence followed by respectful silence is the professional move.
Handling the price objection on follow-up
The most common thing a client says on a follow-up call is a version of 'you are more expensive than the other quotes we got'.
Here is what not to do: immediately offer a discount. That signals that your first price was not your real price, and clients remember that. It also starts a negotiation that only ends one way.
Here is what to do instead: ask what is in the cheaper quotes. Nine times out of ten, the lower price comes with a thinner scope, a looser timeline, or a contractor who is quoting low to win the job and plans to make up the margin in variations. Help the client see that by asking specific questions: 'Does that quote include [specific item from your scope]? What is their payment schedule?'
If they still want to go lower, offer to adjust the scope. Remove a phase. Simplify a finish. Reduce the supervision element. Do not reduce your rate. The margin is what pays for your time, your team, and the risk you are carrying on the job. Cutting it to win a price war is how contractors end up doing more work for less money.
| Situation | What to do | What not to do |
|---|---|---|
| They say they are still deciding | Ask if they have questions about the scope | Ask when they will decide |
| They say you are too expensive | Ask what is in the cheaper quotes and offer to adjust scope | Offer an immediate discount |
| They have gone completely silent | Follow the 3-touch sequence, then let it rest | Send a price-cut email hoping something lands |
| They say they went with someone else | Ask if you can quote the next project | Ask what they paid the other contractor |
| They come back months later | Quote it properly and follow up again | Treat it as urgent because you need the work |
Building a simple follow-up system
If you are running more than a handful of quotes at a time, you need a system. Otherwise things fall through. The simple version is a spreadsheet: quote date, client name, job description, follow-up dates. Check it every morning. The more complex version is a CRM, which some contractors use - there are options built for the trade, though any basic one works for this.
The point is not the tool. The point is that nothing slips. A quote sent on a Tuesday needs a call by Thursday. A quote that got no reply by day 5 needs a message on day 7. If you are tracking it on paper you will forget. If you have a system you will not.
Operators who run a structured bidding process treat follow-up as part of the bid, not an afterthought. The quote is not done when it is sent. It is done when it is accepted, declined, or the sequence runs out.
The follow-up is part of the job, not extra work
Here is the contractor version of this model, the one that actually compounds: you get good at writing clear quotes, you follow up every single one on a system, you handle the price objection properly instead of folding or walking away, and over time your conversion rate goes up without you quoting more jobs.
One extra job a month from better follow-up. At a reasonable margin - say $5,000 to $10,000 per job, depending on the size of work you do (figures in USD - the model and the math are identical in any currency) - that is $60,000 to $120,000 a year from the work you are already quoting. Not from spending more on ads. Not from hiring a salesperson. From the follow-up call you were not making.
That is the construction arbitrage play in miniature: same effort, better process, more margin. If you want to understand the full model, the construction arbitrage overview covers how operators build a business around it.
The contractor who calls back wins. Not always - but often enough that not calling back is a habit you cannot afford.
Mohamed El Hadri, @mointhemarket
If you are building a contracting business that runs on systems rather than luck, the Contractor Club is where that conversation happens. See how operators are using the construction arbitrage model to build businesses that do not depend on them being on the tools every day.
Join the Contractor Club⟶Frequently asked questions
When should I follow up on a construction quote?+
Within 24 to 48 hours of sending it. Not to ask if they have decided - to ask if they have questions about the scope. After that, one message around day 5 to 7, and a final close around day 10 to 14. If there is still no reply after two weeks, let it rest. The sequence is short. What kills jobs is waiting in silence for two weeks before the first follow-up.
What do I say when following up on a construction quote?+
Ask about their questions, not their decision. 'I sent the quote over yesterday - happy to walk you through the scope if anything is unclear' is better than 'Have you had a chance to look at it yet?' One is helpful. The other sounds like you need the job. If they come back with the price being too high, ask what part of the scope they want to adjust - not what budget they have in mind.
How many times should I follow up on a quote?+
Three times over two weeks is a reasonable and professional sequence: a check-in within 48 hours, a short message around day 5 to 7, and a final close around day 10 to 14. After that, stop. Chasing past that point starts to hurt your positioning. The client knows where you are.
How do I follow up without sounding desperate?+
Lead with their interest, not yours. You are following up because they asked for a quote and you want to make sure they have everything they need to make a decision - not because you need the job. That framing changes the tone completely. Short messages, no apologies for following up, and a clear offer to adjust the scope rather than the price.
What if they say my quote is too expensive?+
Ask what they want to change in the scope, not what their budget is. Most clients say 'too expensive' when they are comparing you against a cheaper quote they do not really trust. Walk them through what your price buys them - the supervision, the schedule, the accountability - and ask which part of the job they want to remove to bring the number down. That question usually ends the price conversation.
Should I follow up by phone, text, or email?+
Phone first. If they do not answer, leave a short voicemail and follow up with a text saying you called. Email for the quote itself and the final written close. Text or WhatsApp for the lighter check-ins in between. The first follow-up is always a call - it is harder to ignore and you get real information about where they are in the decision.
The human behind The Playbook
mointhemarket Managing construction businesses across continents - with full location freedom. Running several at once. Bought and sold many more.
Go deeper
Learn the model, then get in the room
The full breakdown of construction arbitrage lives on our sister site, constructionarbitrage.com. When you want the operators who actually run it, join the Construction Arbitrage Players community.
My listening book THE EDGE is out now - 24 chapters on how the money really moves through a contracting business, made to be listened to on the drive. Free to start. See what is inside.
My book The Family Secret - how construction arbitrage really works - is coming soon.
Only Players Know
The game is real. The room is closed.
Contractor Club is a private, application-only circle of construction arbitrage operators. If you think you belong inside, apply and the circle will decide.
More from the Playbook
View all ⟶
Pricing & BiddingConstruction Scope of Work: What It Is and How to Write One
Most jobs go wrong before anyone lifts a tool. The scope of work - the document nobody spent enough time on - is where the dispute starts. Here is how to write one that holds.
Pricing & BiddingHow to Price a Renovation Project (Without Leaving Money on the Table)
Most renovation quotes are built on guesswork. Here is the method that actually holds up: cost stack, markup vs. margin, contingency for the unknowns, and what to do when the client pushes back.