Pricing a renovation project is where most general contractors (main contractors in the UK) leave money behind. Not through laziness - through guessing. You walk a job, you add up what you think it costs, you slap a percentage on top, and you send the quote. (Figures in USD throughout - the model and the math work in any currency.) If the number feels right, it probably isn't. It is just the number you have told yourself enough times that it feels normal.

Here is the method that actually holds up in the real world: how to build your renovation price from the ground up so the margin is there when the job is done.

Behind every profitable renovation quote is the same model: source the client, source the trades, keep the spread. That spread is construction arbitrage - the most reliable structure in this industry - and the price you set is where the spread lives or dies. Get the price wrong and you have simply outsourced the profit to your subs.

What goes into the cost of a renovation

Three buckets. Every renovation price is built from the same three things, and most contractors who underprice miss at least one of them.

  • Labour - what you pay your subs, your team, or yourself for the work. On a heavily trade-intensive job like a bathroom, kitchen, or full refurb, labour is often the largest single cost - typically 40-60% of project cost.
  • Materials - everything that gets bought and stays on site: timber, tiles, fittings, fixtures, skips. For standard residential renovation, materials typically run 30-50% of project cost.
  • Overhead - the cost of running your business that gets allocated to this job: insurance, vehicles, software, office, your time managing the project. If you ignore this bucket, you are subsidising the client.

Get all three right before you add any profit. A quote built on memory and guesswork is not a quote - it is a promise you cannot keep.

Markup vs. margin - the number that actually matters

Here is where most renovation prices go wrong. The contractor adds "20% profit" and thinks they are making 20%. They are not.

Markup is calculated on your costs. Margin is calculated on your sell price. They produce different numbers from the same job, and confusing them is the most expensive mistake in construction pricing.

Markup (% of costs)Margin (% of sell price)Example: $10,000 cost
20%16.7%Sell for $12,000
25%20.0%Sell for $12,500
33%25.0%Sell for $13,300
40%28.6%Sell for $14,000
50%33.3%Sell for $15,000

If your target is a 25% net margin, you need to mark up costs by 33%, not 25%. Work out which number you are targeting before you quote anything. See how to calculate your markup for the formula in full.

How to price a renovation project, step by step

Here is the method. It applies to any renovation job, any size, any country.

  1. 01Walk and define the full scope. Do not price from memory or from a conversation. Walk the job. Write down every trade required, every material line, every day of management time. If you cannot scope it precisely, do not price it - price a preliminary, or charge for a proper survey first.
  2. 02Get actual quotes from your subs. Not last year's prices. Not a ballpark from someone you spoke to on another job. Material prices move; labour rates move. The quote you give the client must be built on prices that exist right now.
  3. 03Price up materials with a wastage buffer. Add 5-10% for wastage on tiles, timber, flooring, and other cut materials. It is not padding - it is what the job actually costs.
  4. 04Calculate your overhead allocation for this job. Work out what your business costs to run per week (insurance, vehicles, software, management). Divide by the number of jobs running in parallel. That is your overhead allocation for this job. It belongs in the price.
  5. 05Apply your target markup. Multiply total costs (labour + materials + overhead) by your markup percentage. Know whether you are targeting markup or margin - they are different numbers. See the table above.
  6. 06Add a contingency for renovation unknowns. Renovation work hides things - behind walls, under floors, inside old services. For a newer building, 5-10% of project cost is a working range. For an older property, 10-15%. Name it in the quote as a contingency line so the client understands it is there for a reason.

Price for risk, not just cost

Two jobs with identical costs can deserve very different prices. The difference is risk. These are the situations where your base price should go up, not down:

  • Occupied buildings - restricted hours, constant client contact, slower access, more disruption to manage. That coordination cost is real. Price it in.
  • Old or unknown construction - properties built several decades ago, or any building where the services and structure are not fully documented. The more unknowns behind the walls, the larger your contingency and the higher your base.
  • Complex sequencing - trades that block each other, long lead times on specialist materials, or a programme that depends on third parties. Price the management time, not just the trade cost.
  • Clients with a track record of scope changes - a client who changed scope three times on a previous job will change it again. Build in a variation clause, not a lower margin. See how to handle change orders before the job starts.

Risk that is not priced is risk you absorb. Absorb enough of it and the margin disappears - even when the job goes right.

When the client says you're too expensive

Don't cut your margin. Cut your scope.

If the client's budget is real and the work can be phased, reduce what the job includes - not what you make on each part. Take out a phase. Use a different spec. Price a smaller scope at the same margin.

If they just want you cheaper to be cheaper, let the job go. The model that actually works is built on the spread between what you charge and what it costs to deliver. That spread only holds if the price is right from the start. A job where you're squeezed on price is not a job you can build a business on.

The way you present the quote matters as much as the number itself. A broken-down quote with clear line items and a named contingency is harder to push back on than a lump sum with no explanation. Clients who understand what they're paying for push back less.

Ready to build a renovation business where the margin survives contact with real life?

Join the Construction Arbitrage Players⟶
ShareXWhatsAppLinkedIn

Frequently asked questions

How much markup should I add to a renovation project?+

For residential renovation, a typical working range is 25-40% markup on project costs, depending on complexity and risk. That translates to a net margin of roughly 20-28%. Simple, predictable jobs with a clear scope can sit at the lower end. Complex or older buildings with higher risk should sit higher. The right number depends on your overhead and local market - work it backwards from the margin you need to run a profitable business.

What is the difference between markup and margin on a renovation?+

Markup is a percentage of your costs. Margin is a percentage of your sell price. If you want a 20% margin, you need a 25% markup on costs - not 20%. Confusing the two is one of the most common reasons renovations look profitable but are not. Run the numbers both ways on your next quote before you send it.

How do I price a renovation project per square foot?+

Per-square-foot pricing is useful as a sanity check, not as a method. Residential renovation costs vary from around $15/sq ft for basic cosmetic work to $150+ for a full gut renovation, with mid-range work typically in the $40-75 range (US figures as a rough benchmark). Use the range to sense-check whether your itemised quote is in the right ballpark - then price the actual scope in front of you, not an average.

Should I use cost-plus or fixed price for renovation work?+

Fixed price works when the scope is fully defined before you start. Cost-plus - where the client pays actual costs plus your fee - works when the scope is unknown or likely to change, particularly in complex renovation or older buildings. Most contractors use fixed price with a clear variation clause for any changes. If the scope is genuinely unknowable, a cost-plus contract protects you from absorbing the risk of discovery.

How do I handle unknown costs in a renovation quote?+

Include a contingency line explicitly in your price: 5-10% of project cost for a newer building, 10-15% for an older property. Name it as 'contingency for unforeseen works' so the client understands what it covers. If you do not use it, it comes back to your margin. If you do, it covers the problem without the job going underwater.

How do I know if my renovation price is competitive?+

Get two or three competitor quotes on a few jobs per year - not to match them, but to know where you sit. If you are always the most expensive and losing every tender, the market is telling you something. If you win most jobs on first quote, you may be underpriced. The goal is not to be the cheapest; it is to price with confidence and win work you can actually make money on.

The human behind The Playbook

Go deeper

Learn the model, then get in the room

The full breakdown of construction arbitrage lives on our sister site, constructionarbitrage.com. When you want the operators who actually run it, join the Construction Arbitrage Players community.

My listening book THE EDGE is out now - 24 chapters on how the money really moves through a contracting business, made to be listened to on the drive. Free to start. See what is inside.

My book The Family Secret - how construction arbitrage really works - is coming soon.

Only Players Know

The game is real. The room is closed.

Contractor Club is a private, application-only circle of construction arbitrage operators. If you think you belong inside, apply and the circle will decide.

More from the Playbook

View all ⟶