How to Price Labor in Construction (Without Killing Your Margin)

Mo El Hadri
Stories by Mo El Hadri
@mointhemarket·10 November 2026·9 min read

To price labor in construction correctly, you need three numbers: what the worker costs you in full, what overhead that worker needs to cover, and what margin you need to stay in business. Everything else is guesswork.

Most contractors price labor wrong. They look at their own wage rate - or the going rate from a mate - and add a vague percentage on top. The jobs look priced. The invoices go out. And then at the end of the year the profit isn't there, because the number never accounted for what labor actually costs.

This is really a conversation about construction arbitrage - the model where you hold the client contract, your subs do the work, and you keep the margin in between. When you understand how to price labor properly, you start to see why the GC earns more than the sub on the same job. And that is a useful thing to understand, whichever side of that equation you are currently on. (All figures in this post are in USD - the math is identical in any currency.)

What labor actually costs: the burden rate

If you pay someone $35 an hour, that is not what they cost you. What you send to their bank account is their wage. What they cost your business is their wage plus every other employer obligation on top of it.

That extra cost is called the labor burden. It includes payroll taxes (Social Security and Medicare in the US, National Insurance in the UK), workers' compensation insurance, general liability insurance allocated to that worker, any employer contribution to health or pension, paid leave, and sometimes tools, uniforms, or vehicle costs.

For most construction businesses, the burden runs 40-50% of base wages. That figure is consistent with Employer Costs for Employee Compensation data published by the US Bureau of Labor Statistics and with what experienced estimators use in the field. It varies by company size and by state - workers' comp rates differ significantly by trade and by jurisdiction, so check yours.

What that means in practice: a worker at $35/hour costs your business roughly $49-$52/hour before they touch a single tool on a client's job. If your quote only accounts for $35, you are losing money on every hour of labor from the moment you price the job.

How to calculate your all-in labor rate

Start with the base wage. Add your burden - calculate it once per year, or update it when your insurance renews or your comp rates change. That gives you your fully burdened labor cost: the floor below which you cannot price a single hour.

Here is a simple worked example. Worker on $35/hour, burden rate 45%:

CalculationAmount per hour
Base wage$35.00
Labor burden (45%)$35 × 0.45$15.75
Fully burdened cost$50.75
Overhead allocation (est.)$10/hour share of fixed costs$10.00
Sub-total (cost + overhead)$60.75
20% margin ($60.75 ÷ 0.80)$75.94
Charge-out rate (rounded)~$76/hour

The overhead allocation covers your office, your insurance, your vehicle, your software, your accountant - all the fixed costs of running the business that are not directly tied to any one job. Take your total monthly fixed costs and divide by the number of billable hours your business produces each month. That is your overhead per hour. Skip this step and your jobs pay the workers but not the business.

Markup vs. margin: get this right before you quote anything

This distinction costs contractors real money. A lot of people use markup and margin as if they mean the same thing. They do not.

  • Markup is what you add on top of cost. A 25% markup on a $100 cost = a $125 price.
  • Margin is profit as a percentage of the final price. That same $125 price gives you a 20% margin ($25 profit on a $125 price).
  • If you want a 20% profit margin, you need a 25% markup. Not 20%.
  • If you want a 25% profit margin, you need a 33% markup.

If you have been adding 20% to your costs and wondering why the margins feel thin, that is why. You have been earning a 16.7% margin, not 20%. On a job with $100,000 of labor cost, that is a $5,000 difference in profit. Run ten jobs a year and that is $50,000 sitting in someone else's pocket.

Labor-only vs. supply-and-fix: they price differently

If you are pricing labor-only - your crew goes in, materials are supplied by others - the whole quote is built on your labor rate. The only variables are hours and rate. Get your rate right and the job works. Get it wrong and there is nowhere to hide.

Supply-and-fix is different. You are pricing both the material and the labor. The common mistake is to price material at cost and labor at cost, then apply one markup to the total. The problem: material and labor have different risk profiles. Labor is predictable if your estimate is good. Material prices move - especially now. Price each separately, apply your margin to each separately, and you have more control over where the money comes from.

How to build your labor estimate on a job

Break the job into tasks. For each task, estimate the hours. Multiply by your fully burdened rate. Add your contingency - 10-15% is a reasonable buffer for jobs with uncertain scope. Add your margin. That is your labor line.

The mistake most people make is estimating hours optimistically and then hitting the job with a crew that runs slower than planned. Keep a log of actual hours on past jobs and compare them to your estimates. After ten jobs you will have your own productivity data. That data is worth more than any estimating guide.

Labor in construction: what it costs as a share of the project

Labor typically runs 30-40% of total residential project cost and 20-35% for commercial new-build, depending on trade mix. Finish trades - painting, decorating, tiling, joinery - run higher on the labor side because the material cost is relatively low. Groundworks, structural steel, and concrete tend to run heavier on material.

Know your number. If labor is 35% of your projects and your labor costs go up 10%, your overall cost has gone up 3.5%. If you have not adjusted your rates in two years, that erosion is already in your numbers.

How GCs price labor differently - and why it matters

Here is where it gets interesting. A sub prices their own trade's labor. A general contractor (main contractor in the UK) prices multiple trades and applies a margin on top of what each sub charges.

The GC does not do the plastering, the electrical, or the groundworks. They win the whole contract from the client, hand each trade to a specialist sub, and charge the client more than the sub costs. The difference between what the GC charges and what the subs cost is the spread. That spread is built on labor the GC never physically performs.

PositionWho does the workWhat you earn
SubcontractorYou and your crewMargin on your trade's labor + materials
General contractorYour subsSpread on every trade package - electrical, plumbing, finishes, groundworks
GC on a $200k projectMultiple subs15-20% on the whole project, not just one package

That is what construction arbitrage looks like in practice. You are not trading your own labor - you are holding the position between the client and the people who do the work. If you want to understand the full model, the construction arbitrage explained post covers it from the ground up.

Common labor pricing mistakes

  • Using wage cost as your labor cost. You are missing the burden - 40-50% of wages in employer costs that do not show up in what you pay the worker.
  • Not separating overhead from labor. Every hour of labor needs to carry a share of your fixed costs. Otherwise the jobs pay the crew and the business dies slowly.
  • Confusing markup with margin. If you want a 25% margin, add 33% to cost. Not 25%.
  • Using the same rate for every trade. A site laborer's cost is not the same as a qualified electrician's. Build separate rates for each role.
  • Pricing from the market down. You look at what competitors charge and work backwards to fit your number under theirs. This is how you end up working for a margin that does not cover your actual costs.

The price you charge has to start from your cost. If you price from the market down, the market decides your margin - and the market does not care whether you make money.

Mo El Hadri, @mointhemarket

A simple pricing check for every job

Before you send any quote, run this check on the labor line:

  1. 01Take your total labor hours estimate.
  2. 02Multiply by your fully burdened labor cost (wages + burden).
  3. 03Add your overhead allocation (monthly overhead divided by monthly billable hours, times the hours on this job).
  4. 04Apply your markup to reach your target margin - remember the markup-margin difference.
  5. 05If the number feels too high for the market, the answer is not to lower your rate. It is to find clients who value the work, or to look at how to run the job with fewer hours.

Most contractors never go through these five steps. They quote what feels right and hope. That is a business model that works until it doesn't. If you want to understand why your margin keeps shrinking, start here - with how you price labor - and work outward from there. The markup calculation guide covers the full math if you want to go deeper.

If you are ready to build a construction business where the money works - not just the jobs - come and join the community.

Request entry to Contractor Club⟶
ShareXWhatsAppLinkedIn

Frequently asked questions

What is a labor burden rate in construction?+

Labor burden is the extra cost on top of a worker's base wage - payroll taxes, employer contributions to health insurance, workers' compensation, liability insurance, tools, and paid leave. For most construction businesses, the burden adds 40-50% on top of the base wage. So if you pay someone $35 an hour, their true cost to your business is closer to $49-$53 an hour before you have even opened the van door.

How much should a contractor charge per hour for labor?+

It depends on your trade, your market, and your cost base - there is no universal answer. The honest way to find your number: add up your worker's fully burdened cost (wages plus all employer costs), then add your overhead allocation (a share of your fixed costs per billable hour), then apply a profit margin. The number you land on is your floor. Anything below that floor and you are working for free. Anything above it is your actual margin.

What percentage of a construction project cost is labor?+

It varies by trade and project type. For residential work, labor typically runs 30-40% of total project cost. For commercial new-build it tends to run a bit lower, around 20-35%, because there is proportionally more material in the mix. Finish trades - painting, tiling, joinery - run higher on the labor side. Groundworks and concrete work run higher on material. Know your trade's ratio: it tells you how exposed you are when labor costs go up.

How do I price labor for a fixed-price construction job?+

Estimate the number of hours each task will take, multiply by your fully burdened labor cost, then apply your margin. Add a contingency (10-15% is common) for tasks where your hours estimate is uncertain. Never price labor at your wage cost alone - that leaves out every other cost your business carries. And build your estimate from the ground up for each job: a day rate that worked on a small refurbish will not hold on a commercial fit-out with different crew sizes and site conditions.

What is the difference between a markup and a margin on labor?+

Markup is how much you add on top of cost. Margin is how much of the final price is profit. A 25% markup on a $100 labor cost gives you a $125 price and a 20% margin. Many contractors confuse the two, price to a 20% markup thinking it is a 20% margin, and wonder why the profit never shows up. If you want a 20% margin, you need a 25% markup. If you want a 25% margin, you need a 33% markup. Work the math both ways before you quote.

How do general contractors price labor compared to subcontractors?+

A sub prices their own trade's labor: their crew, their hours, their rate. A general contractor (main contractor in the UK) prices multiple trades - plumbing, electrical, groundworks, finishing - and applies a margin on top of each. The GC often earns a spread on labor they never physically do themselves. That gap between the sub's cost and what the GC charges the client is the core of the construction arbitrage model - and it is why the GC position is worth building toward.

The human behind The Playbook

Go deeper

Learn the model, then get in the room

The full breakdown of construction arbitrage lives on our sister site, constructionarbitrage.com. When you want the operators who actually run it, join the Construction Arbitrage Players community.

My listening book THE EDGE is out now - 24 chapters on how the money really moves through a contracting business, made to be listened to on the drive. Free to start. See what is inside.

My book The Family Secret - how construction arbitrage really works - is coming soon.

Only Players Know

The game is real. The room is closed.

Contractor Club is a private, application-only circle of construction arbitrage operators. If you think you belong inside, apply and the circle will decide.

More from the Playbook

View all ⟶